Clemens Kirsch Architektur

Primary School Baslergasse

A prototypical approach to wood: an individually developed modular construction consisting of KLH panels, timber framed walls and bearers as a model building for future school extensions/replacement buildings.

Improvised mobile classes from 1974 were replaced by a detached, single-storey annex (4 classes, 2 cloakrooms + ancillary rooms). The option of heightening was included in the plan. Link-up with the listed building by Roland Rainer by a glazed connecting corridor.

Implementation completely in prefabricated timber components (including floorboard) and low-energy construction method. Construction time 4 months.

Procedure

Direct commission

Place

Vienna, AT

Client

MA 19, MA 34, MA 56

Planning

2013-2014

Construction

2014

Effective Area

500 m²

GFA

580 m²

Energy efficiency

Low energy standard

Team

Herta Frischenschlager

Planning HVACR

Bauklimatik

Graphic

sensomatic

Pictures

Hertha Hurnaus

Download

PDF

Plans

Figure Ground Plan
Site plan + Ground floor
Annex possibility
Views
Section

Further projects